The guys have been hard at work! We have a ton of new insulation in the walls (EcoBatt) and in the floors and attic (icynene). Needless to say, we should be kept warm! That is a LOT of icynene!





By the way, these three windows in a row are original to the house!

The drywall was mostly finished last week, and it will be sanded this week. Check it out...

This is the bedroom...

This is one view of the bathroom, looking into the closet.

Another view of the bathroom showing the shower.

The backdoor has been installed. You can see into the bedroom to the right.
Also, our rickety old basement stairs have been replaced now (after EcoBatt was added under them too), so now all of our steps are the same width AND are level. What a concept!

Our homework for this week is to finalize our paint color choices! Stay tuned for our next update...